top of page
California Scrub-Jay on a leafless branch

FAQs

Autumn leaves

Friends of Wildcat Canyon Park put together these answers to common questions about the proposed bike flow trail. Sources include the East Bay Regional Park District's own project materials unless otherwise noted.

 

The proposal

 

What is being proposed?

 

The East Bay Regional Park District (EBRPD) has proposed a 1.4-mile engineered, downhill mountain bike flow trail in the Havey Canyon area of Wildcat Canyon Regional Park, land specifically designated as a protected Natural Area since 1985. The new trail would connect to existing trails, forming a minimum 4.4-mile bike loop back to the top of the flow trail. An even longer return loop involving several trails is also possible. The proposed bike trail would generally follow the current Mezue Trail. A major area of the park would be impacted. EBRPD has narrowly drawn the boundaries, which do not disclose the project’s full extent and impact.

 

What’s the big deal? 

 

This is more than a bike trail. It cuts through habitat that the district itself set aside 40 years ago to stay free of intensive recreation. Records show the site was chosen after private talks with two wealthy donors who pledged $1 million only if the trail is built at this specific location. The district's land-use rules require a public process for a major engineered facility like this. That process was bypassed. 

​

The district's own circulation map also shows the project creates a 4.4-mile dedicated bike loop, not the 1.4 miles their materials suggest. The result will draw more rider traffic into that same protected habitat and increase conflicts with other trail users.

 

What would the trail look like?

​

The new “flow trail” is a highly engineered, race-inspired downhill riding experience, built with berms, rollers, and jumps. The proposed trail will be unlike any of the many multi-use dirt trails currently open to hikers, bikers, and other park users who enjoy nature. Project plans call for barbed wire fencing along sections of the route, which will affect wildlife movement through the canyon and rider safety.

 

Habitat and land use

​

Isn't Wildcat Canyon already protected from this kind of development?

 

Yes, in principle. In 1985, the district designated Wildcat Canyon a Natural Area, meant to remain free of intensive recreation and development except for hiking, equestrian, and service trails. Changing that designation should require a formal Land Use Plan Amendment, with its own public process. The district has instead stated that the Natural Area designation does not legally bar this project, and that the amendment process is not required. Our coalition's position is that this project should not move forward without a public amendment process.

 

What wildlife or habitat concerns are involved?

 

The project site is also located within federally designated critical habitat. The district's biological assessment highlights potential impacts to wildlife such as bumble bees, the California red-legged frog, the Alameda whipsnake, and numerous nesting birds within the project area, along with deer, coyotes, bobcats, and other species inhabiting the canyon. The canyon also supports the endangered Santa Cruz tarplant and hundreds of other native plants. 

 

Connected, undisturbed habitat and wildlife corridors like this are exactly what California has chosen to treat as essential to the state's future, even as similar protections are being rolled back elsewhere in the country.

​

Would the trail change the experience for other park users?

 

Yes. The proposed route follows the Mezue Trail from the ridge down to the creek, an area currently used by many hikers, birders, and equestrians. Designating this trail as a dedicated downhill bike trail would change how all park users share the canyon.

 

Funding and process

 

What is the concern about donor funding?

 

Public records show park district staff began working privately with mountain bike advocates on this project as early as 2021. Two wealthy donors pledged $1 million conditioned specifically on the district building the trail at this site. The district did not disclose the donation, or that it depended on building the trail here, until we filed a Public Records Act request. The district's elected board says it was unaware of this “pay-to-play” arrangement until we made it public.

 

More importantly, the district claims the donation did not influence the site selection, but the pledge was made at the very beginning of the process for this site. The district only receives the donation if it certifies an environmental impact report for this project, regardless of the EIR's findings on wildlife and habitat. Our coalition believes the public deserves confidence that the review now underway is a genuine analysis of the project's impact, not a greenwash for the donation. 

 

Where is this plan in the approval process, and when can the public weigh in?

 

The park district board voted in August 2025 to prepare a full environmental impact report (EIR). Public scoping comments on what the EIR should study were submitted in March 2026. A draft EIR is expected this fall or winter, which will open a brief formal public comment period. Under California environmental law, public comments become part of the official record that the board must respond to before making a final decision. Written comments during that window carry significant weight.​​​​​​​​​​​​​​

Frequently asked questions: the Wildcat Canyon bike trail proposal

California newt

It is horrifying that we have to fight our own government to save the environment.

– Ansel Adams​

About the Friends of Wildcat Canyon Park coalition

 

Is this campaign opposed to mountain biking?

 

No. Friends of Wildcat Canyon Park includes current and former cyclists among its members and supporters. The coalition supports mountain biking as a recreational activity. Its objection is to the location, scale, and design of this specific project, not to biking as a use of the park system.

​

Who is part of Friends of Wildcat Canyon Park?

​

The coalition is a grassroots effort including park users: neighbors, conservation scientists, retired park district staff, hikers, equestrians, cyclists, and fire safety experts, continuing the community advocacy that helped save the canyon from development in 1977. Coalition partners include the Regional Parks Association, the EBRPD Retirees Association, the California Native Plant Society East Bay Chapter, the Golden Gate Bird Alliance, the East Bay Hills Fire Safe Alliance, and Sustainability, Parks, Recycling, and Wildlife Legal Defense Fund (SPRAWLDEF). 

 

How can I get involved?

 

What can I do right now?

 

Sign up at ProtectWildcatCanyon.org to join our email list. Friends of Wildcat Canyon Park will notify supporters the day the draft EIR is released, along with guidance for submitting an effective public comment before the window closes. There will also be a public hearing that will take comments on the EIR. Approval of this project itself will be made by the EBRPD Board. 

 

We need strong public support to urge the board to reject the district’s plan to ignore its own designated Natural Area for the benefit of two wealthy donors and a limited group of park users. See below to take action.

Photo credits: 

​Scrub Jay - © 2026 LAZY BIRDERS

All other photos on this page - © 2026 Craig Noble 

bottom of page